Eurodatum / AI campus tracker
AI campus tracker · v1

Europe's AI campuses, tracked.

Large AI-focused data center projects announced in Europe, with power capacity, status, target dates and a source link on every row. 12 projects, 4.8 GW of announced maximum capacity.

Status:
ProjectCountryPowerStatusTargetSource
Start Campus Sines (Nscale for Microsoft)
Start Campus; Nscale for Microsoft
Portugal
Sines
200–1,200 MWPartly liveLate 2027 (second building)Company
Fluidstack AI supercomputer, France
Fluidstack (MoU with French government)
France
France (site not disclosed)
1,000 MWMoU signedPhase 1 from 2026, beyond 1 GW by 2028Company
Mistral AI × EcoDataCenter
EcoDataCenter, Mistral AI
Sweden
Borlänge
250–600 MWAnnounced2027Press
Stargate Norway
Nscale & Aker (JV), OpenAI as offtaker
Norway
Narvik
230–520 MWAnnounced2026Company
Azora / Tillion data campus
Azora, Tillion
Spain
Villamayor de Gállego, Zaragoza
300 MWAnnounced–Press
DC Malpica AI campus
DC Malpica
Spain
Mora, Toledo
300 MWAnnounced–Press
Apto Lacchiarella campus
Apto
Italy
Lacchiarella, Milan
300 MWAnnounced–Press
EdgeConneX Lombardy campuses
EdgeConneX
Italy
Lombardy
300 MWAnnounced2031Press
QTS Vimercate
QTS Data Centers
Italy
Vimercate, Milan
220 MWAnnounced–Press
Nscale Loughton
Nscale
United Kingdom
Loughton, Essex
50–90 MWDelayedWas Q4 2026; grid power now expected in the 2030sPress
Mistral training cluster (Eclairion)
Eclairion, Fluidstack, Mistral AI
France
Essonne
MW not disclosedAnnounced–Press
Microsoft Zaragoza campus
Microsoft
Spain
Aragón
MW not disclosedAnnouncedConstruction from 2026Press

Method: capacity as announced by the developer (IT or grid basis as stated; not normalised). "Company" = primary release, "Press" = trade press or tracker. Announcements are not commitments; projects get delayed or cancelled, and we update status when sources do. Missing a project? It needs a public source to be listed.