In 2025, Malta generated 2.2 TWh of electricity and used 3.2 TWh. Gas was the largest source at 83% of generation.
484gCO₂/kWh grid intensity#28 of 30 · EU 210
16%low-carbon electricityEU 71%
0.105€/kWh industrial, 2026 H1#8 cheapest · EU 0.135
85€m/yr power for 100 MW AI campus424 kt CO₂/yr
16% of its electricity came from low-carbon sources (nuclear and renewables), below the EU-27 average of 71%. Grid carbon intensity was 484 gCO₂/kWh, ranking #28 of 30 European countries (1 = cleanest), down 20% since 2015. Industrial users consuming 20–70 GWh a year paid €0.105/kWhexcluding VAT in 2026 H1, less than the EU-27 average of €0.135 (#8 cheapest of 28). At €0.097/kWh, a 100 MWAI data center running at full load (876 GWh a year) would pay about €85 million a year for electricity and, on the average grid mix, be responsible for about 424 kt of CO₂.
Electricity generation mix, 2025
Source
Malta
EU-27
Nuclear
0.0%
23.3%
Hydro
0.0%
11.7%
Wind
0.0%
17.1%
Solar
15.5%
13.1%
Bio & other renewables
0.5%
5.8%
Gas
83.1%
16.7%
Coal
0.0%
9.2%
Oil
0.9%
3.1%
Grid carbon intensity, 2005–2025
gCO₂ per kWh of electricity generated. Lower is cleaner.
Wind and solar share of generation
Industrial electricity price, 2019–2026 H1
Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.
Infrastructure & market
0colocation facilities (PeeringDB)
1data centers mapped in OpenStreetMap
–HV substations (pending)
225MW cross-border capacity, 2030 grid (TYNDP)
–wholesale price (no single zone)
–negative-price hours
772cooling degree days (5-yr avg)
1,452kWh/kWp solar yield at the capital (PVGIS)
The TYNDP 2030 starting grid gives it about 225 MW of cross-border transmission capacity. Its climate averaged 772 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.