In 2025, Slovenia generated 14.8 TWh of electricity and used 14.3 TWh. Nuclear was the largest source at 39% of generation.
183gCO₂/kWh grid intensity#17 of 30 · EU 210
79%low-carbon electricityEU 71%
0.130€/kWh industrial, 2026 H1#14 cheapest · EU 0.135
109€m/yr power for 100 MW AI campus161 kt CO₂/yr
79% of its electricity came from low-carbon sources (nuclear and renewables), above the EU-27 average of 71%. Grid carbon intensity was 183 gCO₂/kWh, ranking #17 of 30 European countries (1 = cleanest), down 42% since 2015. Industrial users consuming 20–70 GWh a year paid €0.130/kWhexcluding VAT in 2026 H1, less than the EU-27 average of €0.135 (#14 cheapest of 28). At €0.125/kWh, a 100 MWAI data center running at full load (876 GWh a year) would pay about €109 million a year for electricity and, on the average grid mix, be responsible for about 161 kt of CO₂.
Electricity generation mix, 2025
Source
Slovenia
EU-27
Nuclear
39.3%
23.3%
Hydro
27.2%
11.7%
Wind
0.1%
17.1%
Solar
10.4%
13.1%
Bio & other renewables
2.0%
5.8%
Gas
6.4%
16.7%
Coal
14.7%
9.2%
Oil
0.0%
3.1%
Grid carbon intensity, 2005–2025
gCO₂ per kWh of electricity generated. Lower is cleaner.
Wind and solar share of generation
Industrial electricity price, 2019–2026 H1
Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.
Infrastructure & market
11colocation facilities (PeeringDB)
20data centers mapped in OpenStreetMap
–HV substations (pending)
4,803MW cross-border capacity, 2030 grid (TYNDP)
139€/MWh avg wholesale price, last 12 months
237hours with negative prices, last 12 months
89cooling degree days (5-yr avg)
1,006kWh/kWp solar yield at the capital (PVGIS)
Slovenia has 11 colocation facilities listed in PeeringDB, and hosts 1 EuroHPC AI Factory (Slovenian AI Factory (SLAIF)). Over the last 12 months the average day-ahead wholesale price was €139/MWh, with 237 hours of negative prices. The TYNDP 2030 starting grid gives it about 4,803 MW of cross-border transmission capacity. Its climate averaged 89 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.