In 2025, Luxembourg generated 1.5 TWh of electricity and used 6.7 TWh. Wind was the largest source at 31% of generation.
123gCO₂/kWh grid intensity#9 of 30 · EU 210
92%low-carbon electricityEU 71%
0.104€/kWh industrial, 2026 H1#6 cheapest · EU 0.135
91€m/yr power for 100 MW AI campus108 kt CO₂/yr
92% of its electricity came from low-carbon sources (nuclear and renewables), above the EU-27 average of 71%. Grid carbon intensity was 123 gCO₂/kWh, ranking #9 of 30 European countries (1 = cleanest), down 54% since 2015. Industrial users consuming 20–70 GWh a year paid €0.104/kWhexcluding VAT in 2026 H1, less than the EU-27 average of €0.135 (#6 cheapest of 28). At €0.104/kWh, a 100 MWAI data center running at full load (876 GWh a year) would pay about €91 million a year for electricity and, on the average grid mix, be responsible for about 108 kt of CO₂.
Electricity generation mix, 2025
Source
Luxembourg
EU-27
Nuclear
0.0%
23.3%
Hydro
3.2%
11.7%
Wind
30.5%
17.1%
Solar
30.5%
13.1%
Bio & other renewables
27.3%
5.8%
Gas
3.9%
16.7%
Coal
0.0%
9.2%
Oil
4.5%
3.1%
Grid carbon intensity, 2005–2025
gCO₂ per kWh of electricity generated. Lower is cleaner.
Wind and solar share of generation
Industrial electricity price, 2019–2026 H1
Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.
Infrastructure & market
16colocation facilities (PeeringDB)
132data centers mapped in OpenStreetMap
–HV substations (pending)
4,760MW cross-border capacity, 2030 grid (TYNDP)
–wholesale price (no single zone)
–negative-price hours
10cooling degree days (5-yr avg)
912kWh/kWp solar yield at the capital (PVGIS)
Luxembourg has 16 colocation facilities listed in PeeringDB, and hosts 1 EuroHPC AI Factory (Luxembourg AI Factory). The TYNDP 2030 starting grid gives it about 4,760 MW of cross-border transmission capacity. Its climate averaged 10 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.