Netherlands: electricity for AI data centers

In 2025, Netherlands generated 135.0 TWh of electricity and used 121.1 TWh. Gas was the largest source at 35% of generation.

254gCO₂/kWh grid intensity#20 of 30 · EU 210
54%low-carbon electricityEU 71%
0.139€/kWh industrial, 2026 H1#17 cheapest · EU 0.135
110€m/yr power for 100 MW AI campus222 kt CO₂/yr
Grid access outlook (editorial)Constrained
Widespread congestion, hyperscale limits

54% of its electricity came from low-carbon sources (nuclear and renewables), below the EU-27 average of 71%. Grid carbon intensity was 254 gCO₂/kWh, ranking #20 of 30 European countries (1 = cleanest), down 54% since 2015. Industrial users consuming 20–70 GWh a year paid €0.139/kWh excluding VAT in 2026 H1, more than the EU-27 average of €0.135 (#17 cheapest of 28). At €0.125/kWh, a 100 MW AI data center running at full load (876 GWh a year) would pay about €110 million a year for electricity and, on the average grid mix, be responsible for about 222 kt of CO₂.

Electricity generation mix, 2025

Nuclear: 3.0%Hydro: 0.0%Wind: 25.0%Solar: 21.1%Bio & other renewables: 5.1%Gas: 34.9%Coal: 7.1%Oil: 3.9%
SourceNetherlandsEU-27
Nuclear3.0%23.3%
Hydro0.0%11.7%
Wind25.0%17.1%
Solar21.1%13.1%
Bio & other renewables5.1%5.8%
Gas34.9%16.7%
Coal7.1%9.2%
Oil3.9%3.1%

Grid carbon intensity, 2005–2025

gCO₂ per kWh of electricity generated. Lower is cleaner.

0200400600200520082011201420172020202320252005: 512 g2006: 511 g2007: 510 g2008: 494 g2009: 487 g2010: 478 g2011: 472 g2012: 494 g2013: 501 g2014: 521 g2015: 551 g2016: 525 g2017: 490 g2018: 467 g2019: 410 g2020: 343 g2021: 352 g2022: 326 g2023: 268 g2024: 251 g2025: 254 g254 g

Wind and solar share of generation

0204060200520082011201420172020202320252005: 2%2006: 3%2007: 3%2008: 4%2009: 4%2010: 3%2011: 5%2012: 5%2013: 6%2014: 6%2015: 8%2016: 9%2017: 11%2018: 13%2019: 14%2020: 20%2021: 24%2022: 32%2023: 41%2024: 45%2025: 46%46%

Industrial electricity price, 2019–2026 H1

Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.

0.000.100.202019 H12020 H12021 H12022 H12023 H12024 H12025 H12026 H12019 H1: 0.0662019 H2: 0.0552020 H1: 0.0702020 H2: 0.0572021 H1: 0.0752021 H2: 0.0812022 H1: 0.1472022 H2: 0.1562023 H1: 0.2092023 H2: 0.1692024 H1: 0.1542024 H2: 0.1342025 H1: 0.1432025 H2: 0.1182026 H1: 0.1390.139

Infrastructure & market

162colocation facilities (PeeringDB)
174data centers mapped in OpenStreetMap
–HV substations (pending)
10,800MW cross-border capacity, 2030 grid (TYNDP)
118€/MWh avg wholesale price, last 12 months
409hours with negative prices, last 12 months
12cooling degree days (5-yr avg)
855kWh/kWp solar yield at the capital (PVGIS)

Netherlands has 162 colocation facilities listed in PeeringDB, and hosts 1 EuroHPC AI Factory (NLAIF). Over the last 12 months the average day-ahead wholesale price was €118/MWh, with 409 hours of negative prices. The TYNDP 2030 starting grid gives it about 10,800 MW of cross-border transmission capacity. Its climate averaged 12 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.

See Netherlands on the infrastructure map →

Wholesale electricity price, monthly

Day-ahead average, €/MWh (Energy-Charts / ENTSO-E). Country average across its bidding zones.

010020030025-1126-0126-0326-0526-0726-0926-1125-11: 107 €25-12: 88 €26-01: 108 €26-02: 93 €26-03: 99 €26-04: 84 €26-05: 95 €26-06: 110 €26-07: 106 €26-08: 125 €26-09: 152 €26-10: 172 €26-11: 239 €239 €

Power plant capacity by fuel

MW, plants in the WRI Global Power Plant Database (v1.3, data around 2021). Shows the long-standing fleet, not the latest additions.

NuclearNuclear: 485 MW485 MWWindWind: 1,937 MW1,937 MWSolarSolar: 245 MW245 MWGasGas: 9,312 MW9,312 MWCoalCoal: 5,015 MW5,015 MW

EuroHPC AI Factories

Grid & market notes

  • Amsterdam is a FLAP-D hub with a major internet exchange.
  • TenneT and regional DSOs publish congestion maps; many areas have waiting lists for new large connections.
  • Local and national policy has restricted new hyperscale sites since around 2019–2022.

Official grid operator & sources: TenneT · ENTSO-E · ENTSO-E Transparency Platform

Sources: Our World in Data energy dataset (Ember, Energy Institute), 2025; Eurostat nrg_pc_205, non-household prices excl. VAT, 2026 H1.