In 2025, Greece generated 58.3 TWh of electricity and used 55.6 TWh. Gas was the largest source at 38% of generation.

315gCO₂/kWh grid intensity#24 of 30 · EU 210
50%low-carbon electricityEU 71%
0.143€/kWh industrial, 2026 H1#18 cheapest · EU 0.135
125€m/yr power for 100 MW AI campus276 kt CO₂/yr

50% of its electricity came from low-carbon sources (nuclear and renewables), below the EU-27 average of 71%. Grid carbon intensity was 315 gCO₂/kWh, ranking #24 of 30 European countries (1 = cleanest), down 48% since 2015. Industrial users consuming 20–70 GWh a year paid €0.143/kWh excluding VAT in 2026 H1, more than the EU-27 average of €0.135 (#18 cheapest of 28). At €0.143/kWh, a 100 MW AI data center running at full load (876 GWh a year) would pay about €125 million a year for electricity and, on the average grid mix, be responsible for about 276 kt of CO₂.

Electricity generation mix, 2025

Hydro: 5.9%Wind: 20.4%Solar: 22.2%Bio & other renewables: 1.2%Gas: 38.4%Coal: 4.7%Oil: 7.2%
SourceGreeceEU-27
Nuclear0.0%23.3%
Hydro5.9%11.7%
Wind20.4%17.1%
Solar22.2%13.1%
Bio & other renewables1.2%5.8%
Gas38.4%16.7%
Coal4.7%9.2%
Oil7.2%3.1%

Grid carbon intensity, 2005–2025

gCO₂ per kWh of electricity generated. Lower is cleaner.

05001,000200520082011201420172020202320252005: 783 g2006: 743 g2007: 777 g2008: 759 g2009: 747 g2010: 707 g2011: 725 g2012: 704 g2013: 637 g2014: 668 g2015: 604 g2016: 572 g2017: 580 g2018: 545 g2019: 497 g2020: 423 g2021: 383 g2022: 377 g2023: 336 g2024: 322 g2025: 315 g315 g

Wind and solar share of generation

02040200520082011201420172020202320252005: 2%2006: 3%2007: 3%2008: 4%2009: 4%2010: 5%2011: 7%2012: 9%2013: 14%2014: 15%2015: 17%2016: 17%2017: 17%2018: 19%2019: 24%2020: 29%2021: 29%2022: 35%2023: 41%2024: 42%2025: 43%43%

Industrial electricity price, 2019–2026 H1

Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.

0.000.100.202019 H12020 H12021 H12022 H12023 H12024 H12025 H12026 H12019 H1: 0.0852019 H2: 0.0862020 H1: 0.0842020 H2: 0.0782021 H1: 0.0822021 H2: 0.1462022 H1: 0.1962022 H2: 0.1872023 H1: 0.1602023 H2: 0.1452024 H1: 0.1182024 H2: 0.1632025 H1: 0.1622025 H2: 0.1462026 H1: 0.1430.143

Infrastructure & market

11colocation facilities (PeeringDB)
12data centers mapped in OpenStreetMap
–HV substations (pending)
3,200MW cross-border capacity, 2030 grid (TYNDP)
–wholesale price (no single zone)
–negative-price hours
413cooling degree days (5-yr avg)
1,381kWh/kWp solar yield at the capital (PVGIS)

Greece has 11 colocation facilities listed in PeeringDB, and hosts 1 EuroHPC AI Factory (Pharos). The TYNDP 2030 starting grid gives it about 3,200 MW of cross-border transmission capacity. Its climate averaged 413 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.

See Greece on the infrastructure map →

Power plant capacity by fuel

MW, plants in the WRI Global Power Plant Database (v1.3, data around 2021). Shows the long-standing fleet, not the latest additions.

HydroHydro: 3,501 MW3,501 MWWindWind: 215 MW215 MWSolarSolar: 218 MW218 MWBio & wasteBio & waste: 24 MW24 MWGasGas: 5,205 MW5,205 MWCoalCoal: 4,995 MW4,995 MWOilOil: 501 MW501 MW

EuroHPC AI Factories

Official grid operator & sources: ENTSO-E · ENTSO-E Transparency Platform

Sources: Our World in Data energy dataset (Ember, Energy Institute), 2025; Eurostat nrg_pc_205, non-household prices excl. VAT, 2026 H1.