In 2025, Slovakia generated 29.1 TWh of electricity and used 26.8 TWh. Nuclear was the largest source at 66% of generation.

95gCO₂/kWh grid intensity#6 of 30 · EU 210
85%low-carbon electricityEU 71%
0.171€/kWh industrial, 2026 H1#24 cheapest · EU 0.135
133€m/yr power for 100 MW AI campus83 kt CO₂/yr
Grid access outlook (editorial)More room
Low-carbon nuclear & hydro grid

85% of its electricity came from low-carbon sources (nuclear and renewables), above the EU-27 average of 71%. Grid carbon intensity was 95 gCO₂/kWh, ranking #6 of 30 European countries (1 = cleanest), down 47% since 2015. Industrial users consuming 20–70 GWh a year paid €0.171/kWh excluding VAT in 2026 H1, more than the EU-27 average of €0.135 (#24 cheapest of 28). At €0.151/kWh, a 100 MW AI data center running at full load (876 GWh a year) would pay about €133 million a year for electricity and, on the average grid mix, be responsible for about 83 kt of CO₂.

Electricity generation mix, 2025

Nuclear: 66.4%Hydro: 10.9%Solar: 2.4%Bio & other renewables: 5.5%Gas: 11.3%Coal: 1.1%Oil: 2.5%
SourceSlovakiaEU-27
Nuclear66.4%23.3%
Hydro10.9%11.7%
Wind0.0%17.1%
Solar2.4%13.1%
Bio & other renewables5.5%5.8%
Gas11.3%16.7%
Coal1.1%9.2%
Oil2.5%3.1%

Grid carbon intensity, 2005–2025

gCO₂ per kWh of electricity generated. Lower is cleaner.

0100200300200520082011201420172020202320252005: 239 g2006: 231 g2007: 235 g2008: 224 g2009: 221 g2010: 205 g2011: 214 g2012: 204 g2013: 182 g2014: 173 g2015: 177 g2016: 177 g2017: 183 g2018: 192 g2019: 171 g2020: 159 g2021: 167 g2022: 142 g2023: 115 g2024: 97 g2025: 95 g95 g

Wind and solar share of generation

0123200520082011201420172020202320252005: 0%2006: 0%2007: 0%2008: 0%2009: 0%2010: 0%2011: 1%2012: 2%2013: 2%2014: 2%2015: 2%2016: 2%2017: 2%2018: 2%2019: 2%2020: 2%2021: 2%2022: 2%2023: 2%2024: 2%2025: 2%2%

Industrial electricity price, 2019–2026 H1

Non-household consumers using 20–70 GWh/yr, excluding VAT and recoverable taxes, €/kWh.

0.000.100.200.302019 H12020 H12021 H12022 H12023 H12024 H12025 H12026 H12019 H1: 0.1112019 H2: 0.1102020 H1: 0.1142020 H2: 0.1122021 H1: 0.1142021 H2: 0.1342022 H1: 0.2082022 H2: 0.2572023 H1: 0.2482023 H2: 0.2202024 H1: 0.1622024 H2: 0.1812025 H1: 0.1722025 H2: 0.1752026 H1: 0.1710.171

Infrastructure & market

6colocation facilities (PeeringDB)
4data centers mapped in OpenStreetMap
–HV substations (pending)
5,912MW cross-border capacity, 2030 grid (TYNDP)
–wholesale price (no single zone)
–negative-price hours
65cooling degree days (5-yr avg)
1,011kWh/kWp solar yield at the capital (PVGIS)

Slovakia has 6 colocation facilities listed in PeeringDB. The TYNDP 2030 starting grid gives it about 5,912 MW of cross-border transmission capacity. Its climate averaged 65 cooling degree days a year (Eurostat), a rough guide to how hard data center cooling has to work.

See Slovakia on the infrastructure map →

Power plant capacity by fuel

MW, plants in the WRI Global Power Plant Database (v1.3, data around 2021). Shows the long-standing fleet, not the latest additions.

NuclearNuclear: 1,760 MW1,760 MWHydroHydro: 2,321 MW2,321 MWSolarSolar: 24 MW24 MWGasGas: 728 MW728 MWCoalCoal: 1,398 MW1,398 MW

Grid & market notes

  • Nuclear plants at Mochovce and Bohunice supply a large share of electricity.
  • Bratislava is close to Vienna and well connected to regional networks.
  • Smaller market, which can mean faster access to grid capacity than in FLAP-D hubs.

Official grid operator & sources: SEPS · ENTSO-E · ENTSO-E Transparency Platform